Hell on Earth

Dallol

Mining professionals

Ours Projects

SEMERA CRUSHER SITE :

Activities: Crushing and packaging copper ore in 1000kg/100kg bags. Ower: We rent a crusher and modify it to crush in 0.0 or finer powder according to customer specifications. Monthly production capacity: 300/500 tons of copper ore (can be doubled or tripled depending on demand). Grade (content): Between 15% and 30% copper content

Copper Projects (Dalol Sites)

Activities :
Extraction of copper ore and marketing of raw ore, primarily involving local artisanal mining associations. Crushing and packaging copper ore ( finer powder) at the Semera Crusher Site. Partners: ADOKUWA Copper Association, Selam Cooperative. ORX General Trading
Capacity (Semera Crusher): Monthly production of 300-500 tons, scalable based on demand.

RARE EARTH POTENTIAL

Our recent mineral analysis has revealed a promising concentration of valuable rare earth and strategic metals, confirming the high potential of our mining site. Detected Elements and Concentrations: Iron – 58.545% Gold – 6.155% Rhodium – 6.155% Zinc – 5.898% Iridium – 5.826% Ruthenium – 4.250% Osmium – 4.355% Platinum – 3.038% Palladium – 1.956% Cobalt – 1.939%

YALDI GOLD/SILVER PROJECT :

Activities :
High grade Gold and silver mining. Bonanza Grade Au-Ag: Structurally controlled quartz-carbonate veins host high-grade gold (up to 10.22 ppm Au) and exceptionally rich silver mineralization (up to 2948 ppm Ag).
The geological setting : (ANS basement window, bimodal volcanics, shear zones) is highly conducive to hosting large Orogenic/Epithermal deposits, with untested potential for critical metals/REEs

Chalcopiryte project :

Activities: Exploitation and processing of chalcopyrite copper ores and associated metallic minerals. Ownership: Fully owned by Ado-Yaldi Mining PLC.

Infrastructure: Proximity to Addis Ababa-Djibouti road, available power grid, on-site water source (well).

VMS Gold/Copper Project:

Activities:
Exploration and potential extraction of gold and copper ores from a Volcanogenic Massive Sulfide deposit type.
Infrastructure :
A paved road is 20 km away, accessible via a stabilized track. A well is available on-site.

Bentonite and Talc project :

Activities:
Extraction and processing of Bentonite and Talc
Status :
Currently promoting these minerals with the objective of establishing a dedicated processing plant.
Infrastructure:
The site benefits from proximity to the main Addis Ababa-Djibouti road, an available power grid, and an on-site water source (well).

Citrine & cinabar project :

Activities:
Exploration and potential extraction of Citrine and Cinnabar.

Infrastructure: Proximity to Addis Ababa-Djibouti road, available power grid, on-site water source (well).

Status: Currently in the exploration phase. Feasibility and environmental studies are required before mining can begin. A freshwater source is available on-site.

Mangano-calcite (Manganese) Project:

Activities:
Potential exploration and extraction site for Manganese ores.
Status :
Currently undergoing sampling and analysis.

GEMSTONES PROJECT :

ABOUT US

ADO YALDI MINING PLC

  • Strategic Growth Platform: Actively seeking synergistic, win-win partnerships to access investment capital, advanced machinery, project financing, and established international marketing networks (e.g., planned partnership with Universal Service Holding).

ADO YALDI MINING PLC

Ethiopia, Afar Region, Semera, Dalafa Follow on Social Media: Ado-Yaldi Mining PLC

QUESTIONS?

Follow on Social Media: Ado-Yaldi Mining PLC

 Yaldibusiness@gmail.com